El Reconstruction

For this whole week, the El will be under construction, being shut down from 40th to 69th street, for all intensive purposes. Today was my first day experiencing this ordeal. Let me tell you, it sucks. Take a look at this picture for a rough estimate of what's going on.



The optimal route would go right down Market Street. As you can see by the blue line, it doesn't do this, even after going halfway to Delaware first. This is due to the fact that, indeed, the El is under construction, rendering most of Market Street inaccessible. But the mystery of the new route is that first mile or so. I would assume this is also due to the fact that the shortcut to Chestnut (the road the El Shuttle, the blue line, takes before it turns to meet Market street), goes down Market Street as well, and you're only able to turn off at the first elevated station. So, the first mile may be necessary, however long it is. This first mile is the detour for everyone else going down Market, of course, or so it seems, as it was backed up immensely, and took 10-15 minutes of bumper-to-bumper hell to get through it.

Ok, the way back is fine. You travel the scenic route, up Walnut. It's slow but direct.

On the way in today, there was no mile long detour. This time, we were in one of those double buses with the flexy thing in the middle. That was different. Anyway, departure time 7:58 AM at the end of my street, walked into my office at 8:57 AM (approximate). Not a bad way in.

blog comments powered by Disqus